|
001 The more important tools: Front left is Shopsmith bandsaw on own stand, then DeWalt planer. On workbench left rear is Del
Date: 02/26/2006
Views: 432
|
002 This door will be the building board once we have the backbone assembled and start erecting the frames.
Date: 02/26/2006
Views: 285
|
003 Keel pieces (forward lower, aft above) and forefoot on work heavy glass used to keep things in line. Note 12" metal r
Date: 02/26/2006
Views: 295
|
|
004 This and the next 4 show how we shape the various parts. This part will be the bowsprit knee that runs up the stempost and
Date: 02/28/2006
Views: 304
|
005 We cut the pattern out and glue it to the wood with the 3M Spray Mount glue, oriented to get the grain direction right.
Date: 02/28/2006
Views: 307
|
006 Cutting away excess wood with the bandsaw.
Date: 02/28/2006
Views: 307
|
|
007 Cutting the final shape along the printed lines with the scroll saw.
Date: 02/28/2006
Views: 352
|
008 The finished product. The remains of the paper pattern and the glue are removed with acetone.
Date: 02/28/2006
Views: 292
|
009 Milling the long run of the rabbet for the garboard strake into the keel. Using the Shopsmith set up as a drillpress, but
Date: 03/01/2006
Views: 255
|